Do you have recurring demand for electrotechnical components?

Tell us about your typical usage — product families, approximate quantities, and delivery frequency. We'll propose terms matched to your production schedule.

Let's talk →

What a framework order is

A framework order (sometimes called a call-off agreement or recurring-supply arrangement) is a way of working together where the client and supplier agree in advance on expected demand for a given period — a month, a quarter, a year — instead of negotiating every single order from scratch. This lets the supplier secure the right stock ahead of time, and gives the client a shorter lead time on each individual delivery, since the goods don't need to be freshly imported or manufactured to order every time. It's a standard model in industrial procurement, especially where component usage is regular and predictable — for example, in serial production.

How this works at CME

CME owns and personally runs its own warehouse in Piaseczno, near Warsaw — this lets us keep stock on hand and keep full control over product availability and delivery timelines, rather than depending on someone else's manufacturing or import schedule. We work directly with manufacturers in Turkey and Europe, which shortens the supply chain between the factory and your warehouse. Under a framework order, we agree on expected demand with the client, hold the matching stock on their behalf, and coordinate subsequent deliveries around their production schedule — rather than handling only single, disconnected orders.

Single order vs. framework order

AspectSingle orderFramework order
Planning horizonOne order at a timeAgreed period
Stock availabilityDepends on production timelineSecured in advance
Delivery lead timeDepends on current stockShortened — already in stock
Delivery scheduleSet per orderCoordinated with production
Best forOne-off purchasesRecurring usage

The "agreed period" is typically a month, quarter, or year — the exact horizon is set individually with each client. "Secured in advance" means the goods reach CME's warehouse in Piaseczno before a specific delivery order comes in.

Who this fits

A framework order works well wherever demand for a given component is fairly regular — for example, in serial production, where a particular cable lug, gland, or terminal block is consumed in similar quantities month after month. If you're buying a product one time, or trialing a new supplier on a small batch, a regular single order is simpler and entirely sufficient — you can always move to a framework order later, once demand stabilizes.

Common mistake

Treating a framework order as a rigid, multi-year contract with penalties for missed volumes. In practice, it's primarily an agreement on expected demand that lets CME secure stock ahead of time — the specific terms (period, approximate quantities, schedule flexibility) are set individually with each client, depending on the product family and the nature of the relationship. We always discuss the details directly before anything is agreed.

How to get started

  1. Contact CME and describe your typical demand — which products, in what quantities, and how often.
  2. Together, we agree on an approximate volume for the period and a delivery schedule matched to your production.
  3. CME secures the matching stock in our own warehouse in Piaseczno.
  4. Subsequent deliveries follow the agreed schedule — no need to renegotiate every order from scratch.

What to prepare for the conversation

  1. Product families and approximate volumes (e.g. monthly or annual).
  2. Expected delivery frequency and schedule.
  3. Delivery location — directly to your facility, or pickup from CME's warehouse in Piaseczno.
  4. Required certifications or standards (e.g. RoHS, REACH, UL, VDE).
  5. Approximate time horizon for the arrangement.

Frequently asked questions

Does a framework order cover only one product family?

No — it can cover any combination of products from CME's range (cables, cable glands, terminals and connectors, cable lugs, PCB terminal blocks, and other families), agreed together with the client.

Can I change my demand during the arrangement?

We coordinate the delivery schedule with the client's production plan, so changes are discussed as they come up — the exact flexibility depends on the specific arrangement and is part of the conversation when we start working together.

Does a framework order mean higher minimum prices or longer commitments than a regular order?

The specific commercial terms — pricing, volumes, duration — are set individually with CME depending on the product and the scale of demand. It's best to discuss this directly with our team.

Let's talk about a framework order Share your product families, approximate volumes, and expected delivery schedule — we'll propose terms for working together.
Send a request →

See also more about how CME works.